Road Closure for Woodland Drive
Matt BosterViewed: 2066
Posted by: Matt Boster
Date: Mar 11 2017 9:40 PM
Beginning Wednesday, March 15, 2017 at 7:00 a.m., the section of Woodland Drive between Main Street and Winding Road will be closed to through traffic for approximately eight (8) weeks.
The closure is needed in order for the City of Dothan to replace sanitary sewer lines along Woodland Drive.
<- back